SMART DAK Cervical Cancer Screening
0.0.1 - ci-build
SMART DAK Cervical Cancer Screening, published by Dan Heslinga (independent contributor). This guide is not an authorized publication; it is the continuous build for version 0.0.1 built by the FHIR (HL7® FHIR® Standard) CI Build. This version is based on the current content of https://github.com/dhes/smart-dak-cxca/ and changes regularly. See the Directory of published versions
| Official URL: http://smart.who.int/cxca/PlanDefinition/CXCAD18SRecallScheduling | Version: 0.0.1 | |||
| Draft as of 2026-05-14 | Computable Name: CXCAD18SRecallScheduling | |||
Decision support for recall and re-call per Mongolia MOH Order A/641 (2020) section 2.3. Evaluates seven timeout triggers (HPV sample timeout, positive-result follow-up timeout, biopsy timeout, treatment-after-biopsy timeout, cytology unread timeout, second-reminder, missed scheduled exam) and instantiates a CommunicationRequest reminder for each fired trigger. The 187 LTFU women from the April 2026 Khan-Uul pilot represent the empirical case for why this layer matters — DE39 (positive-result follow-up timeout, 4 weeks) is the trigger that should fire for each of them.
| Id: | CXCAD18SRecallScheduling | |||||||
|---|---|---|---|---|---|---|---|---|
| Url: | CXCA.D18.S — Recall Scheduling | |||||||
| Version: | 0.0.1 | |||||||
| Title: | CXCA.D18.S — Recall Scheduling | |||||||
| Status: | draft | |||||||
| Type: |
system: http://terminology.hl7.org/CodeSystem/plan-definition-type code: eca-rule |
|||||||
| Date: | 2026-05-14 00:50:23+0000 | |||||||
| Publisher: | Dan Heslinga (independent contributor) | |||||||
| Description: | Decision support for recall and re-call per Mongolia MOH Order A/641 (2020) section 2.3. Evaluates seven timeout triggers (HPV sample timeout, positive-result follow-up timeout, biopsy timeout, treatment-after-biopsy timeout, cytology unread timeout, second-reminder, missed scheduled exam) and instantiates a CommunicationRequest reminder for each fired trigger. The 187 LTFU women from the April 2026 Khan-Uul pilot represent the empirical case for why this layer matters — DE39 (positive-result follow-up timeout, 4 weeks) is the trigger that should fire for each of them. |
|||||||
| Libraries: |
|
|||||||
| Actions: |
|