Ethiopia FHIR Implementation Guide - HIV Treatment & Care Services
1.0.1 - ci-build Ethiopia flag

Ethiopia FHIR Implementation Guide - HIV Treatment & Care Services, published by Jembi Health Systems. This guide is not an authorized publication; it is the continuous build for version 1.0.1 built by the FHIR (HL7® FHIR® Standard) CI Build. This version is based on the current content of https://github.com/jembi/ethiopia-hiv/ and changes regularly. See the Directory of published versions

ValueSet: Viral Load Indication

Official URL: http://moh.gov.et/fhir/hiv/ValueSet/vl-indication-value-set Version: 1.0.1
Active as of 2024-10-14 Computable Name: VLIndicationValueSet

Codes used for representing the indication type for the viral load.

References

Logical Definition (CLD)

Generated Narrative: ValueSet vl-indication-value-set

This value set includes codes based on the following rules:

 

Expansion

Generated Narrative: ValueSet

This value set contains 13 concepts

CodeSystemDisplay
  1st-VL-Test-3-months-Post-ARThttp://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-systemFirst viral load test at 3 months or longer post ART
  2nd-VL-Test-6-months-Post-ARThttp://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-systemFirst viral load test at 6 months or longer post ART
  2nd-VL-Test-12-months-Post-ARThttp://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system2nd VL at 12 month post ART
  Annual-VL-Testhttp://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-systemAnnual VL Test
  First-ANC-visithttp://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-systemAt the first ANC visit
  34-36-weeks-of-gestationhttp://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-systemAt 34-36 weeks of gestation
  3-months-after-deliveryhttp://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-systemThree months after delivery
  6-months-after-first-VL-at-postnatal-periodhttp://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-systemSix months after the first VL at postnatal period
  Every-6-months-until-MTCT-endshttp://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-systemEvery six months until MTCT ends
  VL-after-EAC-Repeat-VL-50-to-1000http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-systemVL after EAC: Repeat VL > 50 to <= 1000 copies/ml
  VL-after-EAC-Confirmatory-VL-Initial-50-to-1000http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-systemVL after EAC: Confirmatory VL: Initial > 50 to <= 1000 copies/ml
  Suspected-ART-Failurehttp://moh.gov.et/fhir/hiv/CodeSystem/targeted-indication-viral-load-code-systemSuspected ART Failure
  Repeat-or-confirmatory-VL-Initial-VL-greater-than-1000http://moh.gov.et/fhir/hiv/CodeSystem/targeted-indication-viral-load-code-systemRepeat or confirmatory VL Initial Viral load greater than 1000

Explanation of the columns that may appear on this page:

Level A few code lists that FHIR defines are hierarchical - each code is assigned a level. In this scheme, some codes are under other codes, and imply that the code they are under also applies
System The source of the definition of the code (when the value set draws in codes defined elsewhere)
Code The code (used as the code in the resource instance)
Display The display (used in the display element of a Coding). If there is no display, implementers should not simply display the code, but map the concept into their application
Definition An explanation of the meaning of the concept
Comments Additional notes about how to use the code