Ethiopia FHIR Implementation Guide - HIV Treatment & Care Services
1.0.1 - ci-build
Ethiopia FHIR Implementation Guide - HIV Treatment & Care Services, published by Jembi Health Systems. This guide is not an authorized publication; it is the continuous build for version 1.0.1 built by the FHIR (HL7® FHIR® Standard) CI Build. This version is based on the current content of https://github.com/jembi/ethiopia-hiv/ and changes regularly. See the Directory of published versions
Official URL: http://moh.gov.et/fhir/hiv/ValueSet/vl-indication-value-set | Version: 1.0.1 | |||
Active as of 2024-10-14 | Computable Name: VLIndicationValueSet |
Codes used for representing the indication type for the viral load.
References
Generated Narrative: ValueSet vl-indication-value-set
This value set includes codes based on the following rules:
http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system
http://moh.gov.et/fhir/hiv/CodeSystem/targeted-indication-viral-load-code-system
Generated Narrative: ValueSet
Expansion based on:
This value set contains 13 concepts
Code | System | Display |
1st-VL-Test-3-months-Post-ART | http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system | First viral load test at 3 months or longer post ART |
2nd-VL-Test-6-months-Post-ART | http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system | First viral load test at 6 months or longer post ART |
2nd-VL-Test-12-months-Post-ART | http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system | 2nd VL at 12 month post ART |
Annual-VL-Test | http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system | Annual VL Test |
First-ANC-visit | http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system | At the first ANC visit |
34-36-weeks-of-gestation | http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system | At 34-36 weeks of gestation |
3-months-after-delivery | http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system | Three months after delivery |
6-months-after-first-VL-at-postnatal-period | http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system | Six months after the first VL at postnatal period |
Every-6-months-until-MTCT-ends | http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system | Every six months until MTCT ends |
VL-after-EAC-Repeat-VL-50-to-1000 | http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system | VL after EAC: Repeat VL > 50 to <= 1000 copies/ml |
VL-after-EAC-Confirmatory-VL-Initial-50-to-1000 | http://moh.gov.et/fhir/hiv/CodeSystem/routine-indication-viral-load-code-system | VL after EAC: Confirmatory VL: Initial > 50 to <= 1000 copies/ml |
Suspected-ART-Failure | http://moh.gov.et/fhir/hiv/CodeSystem/targeted-indication-viral-load-code-system | Suspected ART Failure |
Repeat-or-confirmatory-VL-Initial-VL-greater-than-1000 | http://moh.gov.et/fhir/hiv/CodeSystem/targeted-indication-viral-load-code-system | Repeat or confirmatory VL Initial Viral load greater than 1000 |
Explanation of the columns that may appear on this page:
Level | A few code lists that FHIR defines are hierarchical - each code is assigned a level. In this scheme, some codes are under other codes, and imply that the code they are under also applies |
System | The source of the definition of the code (when the value set draws in codes defined elsewhere) |
Code | The code (used as the code in the resource instance) |
Display | The display (used in the display element of a Coding). If there is no display, implementers should not simply display the code, but map the concept into their application |
Definition | An explanation of the meaning of the concept |
Comments | Additional notes about how to use the code |