HL7 Terminology (THO)
6.0.2 - Continuous Process Integration (ci build) International flag

HL7 Terminology (THO), published by HL7 International - Vocabulary Work Group. This guide is not an authorized publication; it is the continuous build for version 6.0.2 built by the FHIR (HL7® FHIR® Standard) CI Build. This version is based on the current content of https://github.com/HL7/UTG/ and changes regularly. See the Directory of published versions

ValueSet: GTSAbbreviation

Official URL: http://terminology.hl7.org/ValueSet/v3-GTSAbbreviation Version: 3.0.0
Active as of 2014-03-26 Responsible: Health Level Seven International Computable Name: GTSAbbreviation
Other Identifiers: OID:2.16.840.1.113883.1.11.10720

Copyright/Legal: This material derives from the HL7 Terminology THO. THO is copyright ©1989+ Health Level Seven International and is made available under the CC0 designation. For more licensing information see: https://terminology.hl7.org/license.html

No description

References

This value set is not used here; it may be used elsewhere (e.g. specifications and/or implementations that use this content)

Logical Definition (CLD)

Generated Narrative: ValueSet v3-GTSAbbreviation

Language: en

This value set includes codes based on the following rules:

  • Include these codes as defined in http://terminology.hl7.org/CodeSystem/v3-GTSAbbreviation
    CodeDisplayDefinition
    AMAMEvery morning at institution specified times.
    BIDBIDTwo times a day at institution specified time
    JBJBRegular business days (Monday to Friday excluding holidays)
    JEJERegular weekends (Saturday and Sunday excluding holidays)
    PMPMEvery afternoon at institution specified times.
    QIDQIDFour times a day at institution specified time
    TIDTIDThree times a day at institution specified time
  • Import all the codes that are contained in GTSAbbreviationHolidays

 

Expansion

Generated Narrative: ValueSet

Language: en

This value set contains 33 concepts

CodeSystemDisplayDefinition
  AMhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationAM

Every morning at institution specified times.

  BIDhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationBID

Two times a day at institution specified time

  JBhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJB

Regular business days (Monday to Friday excluding holidays)

  JEhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJE

Regular weekends (Saturday and Sunday excluding holidays)

  PMhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationPM

Every afternoon at institution specified times.

  QIDhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationQID

Four times a day at institution specified time

  TIDhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationTID

Three times a day at institution specified time

  JHhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationGTSAbbreviationHolidays

Holidays

  _GTSAbbreviationHolidaysChristianRomanhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationGTSAbbreviationHolidaysChristianRoman

Christian Holidays (Roman/Gregorian [Western] Tradition.)

  JHCHREAShttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHCHREAS

Easter Sunday. The Easter date is a rather complex calculation based on Astronomical tables describing full moon dates. Details can be found at [http://www.assa.org.au/edm.html, and http://aa.usno.navy.mil/AA/faq/docs/easter.html]. Note that the Christian Orthodox Holidays are based on the Julian calendar.

  JHCHRGFRhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHCHRGFR

Good Friday, is the Friday right before Easter Sunday.

  JHCHRNEWhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHCHRNEW

New Year's Day (January 1)

  JHCHRPENhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHCHRPEN

Pentecost Sunday, is seven weeks after Easter (the 50th day of Easter).

  JHCHRXMEhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHCHRXME

Christmas Eve (December 24)

  JHCHRXMShttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHCHRXMS

Christmas Day (December 25)

  JHNNLhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationThe Netherlands National Holidays

**Description:**The Netherlands National Holidays.

  JHNNLLDhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationLiberation day (May 5 every five years)

**Description:**Liberation day (May 5 every five years)

  JHNNLQDhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationQueen's day (April 30)

**Description:**Queen's day (April 30)

  JHNNLSKhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationSinterklaas (December 5)

**Description:**Sinterklaas (December 5)

  JHNUShttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationGTSAbbreviationHolidaysUSNational

United States National Holidays (public holidays for federal employees established by U.S. Federal law 5 U.S.C. 6103).

  JHNUSCLMhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSCLM

Columbus Day, the second Monday in October.

  JHNUSINDhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSIND

Independence Day (4th of July)

  JHNUSIND1http://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSIND1

Alternative Monday after 4th of July Weekend [5 U.S.C. 6103(b)].

  JHNUSIND5http://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSIND5

Alternative Friday before 4th of July Weekend [5 U.S.C. 6103(b)].

  JHNUSLBRhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSLBR

Labor Day, the first Monday in September.

  JHNUSMEMhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSMEM

Memorial Day, the last Monday in May.

  JHNUSMEM5http://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSMEM5

Friday before Memorial Day Weekend

  JHNUSMEM6http://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSMEM6

Saturday of Memorial Day Weekend

  JHNUSMLKhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSMLK

Dr. Martin Luther King, Jr. Day, the third Monday in January.

  JHNUSPREhttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSPRE

Washington's Birthday (Presidential Day) the third Monday in February.

  JHNUSTKShttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSTKS

Thanksgiving Day, the fourth Thursday in November.

  JHNUSTKS5http://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSTKS5

Friday after Thanksgiving.

  JHNUSVEThttp://terminology.hl7.org/CodeSystem/v3-GTSAbbreviationJHNUSVET

Veteran's Day, November 11.


Explanation of the columns that may appear on this page:

Level A few code lists that FHIR defines are hierarchical - each code is assigned a level. In this scheme, some codes are under other codes, and imply that the code they are under also applies
System The source of the definition of the code (when the value set draws in codes defined elsewhere)
Code The code (used as the code in the resource instance)
Display The display (used in the display element of a Coding). If there is no display, implementers should not simply display the code, but map the concept into their application
Definition An explanation of the meaning of the concept
Comments Additional notes about how to use the code

History

DateActionCustodianAuthorComment
2023-11-14reviseTSMGMarc DuteauAdd standard copyright and contact to internal content; up-476
2022-10-18reviseTSMGMarc DuteauFixing missing metadata; up-349
2020-05-06reviseVocabulary WGTed KleinMigrated to the UTG maintenance environment and publishing tooling.
2014-03-26revise2014T1_2014-03-26_001283 (RIM release ID)Vocabulary (Woody Beeler) (no record of original request)Lock all vaue sets untouched since 2014-03-26 to trackingId 2014T1_2014_03_26