Patient Cost Transparency Implementation Guide, published by HL7 International / Financial Management. This guide is not an authorized publication; it is the continuous build for version 2.0.2 built by the FHIR (HL7® FHIR® Standard) CI Build. This version is based on the current content of https://github.com/HL7/davinci-pct/ and changes regularly. See the Directory of published versions
| Official URL: http://hl7.org/fhir/us/davinci-pct/ValueSet/PCTCoordinationTaskStatusCodes | Version: 2.0.2 | ||||
| Standards status: Trial-use | Maturity Level: 2 | Computable Name: PCTCoordinationTaskStatusCodes | |||
| Other Identifiers: OID:2.16.840.1.113883.4.642.40.4.48.13 | |||||
Codes allowed for a GFE Coordination Task status
References
Changes since version 1.1.0:
http://hl7.org/fhir/task-status version 📍4.0.1| Code | Display | Definition |
| draft | Draft | The task is not yet ready to be acted upon. |
| requested | Requested | The task is ready to be acted upon and action is sought. |
| in-progress | In Progress | The task has been started but is not yet complete. |
| ready | Ready | The task is ready to be performed, but no action has yet been taken. Used in place of requested/received/accepted/rejected when request assignment and acceptance is a given. |
| cancelled | Cancelled | The task was not completed. |
| on-hold | On Hold | The task has been started but work has been paused. |
| failed | Failed | The task was attempted but could not be completed due to some error. |
| completed | Completed | The task has been completed. |
| entered-in-error | Entered in Error | The task should never have existed and is retained only because of the possibility it may have used. |
Expansion performed internally based on codesystem TaskStatus v4.0.1 (CodeSystem)
This value set contains 9 concepts
| System | Code | Display (en) | Definition | JSON | XML |
http://hl7.org/fhir/task-status | draft | Draft | The task is not yet ready to be acted upon. | ||
http://hl7.org/fhir/task-status | requested | Requested | The task is ready to be acted upon and action is sought. | ||
http://hl7.org/fhir/task-status | in-progress | In Progress | The task has been started but is not yet complete. | ||
http://hl7.org/fhir/task-status | ready | Ready | The task is ready to be performed, but no action has yet been taken. Used in place of requested/received/accepted/rejected when request assignment and acceptance is a given. | ||
http://hl7.org/fhir/task-status | cancelled | Cancelled | The task was not completed. | ||
http://hl7.org/fhir/task-status | on-hold | On Hold | The task has been started but work has been paused. | ||
http://hl7.org/fhir/task-status | failed | Failed | The task was attempted but could not be completed due to some error. | ||
http://hl7.org/fhir/task-status | completed | Completed | The task has been completed. | ||
http://hl7.org/fhir/task-status | entered-in-error | Entered in Error | The task should never have existed and is retained only because of the possibility it may have used. |